






Overview: The Mont in Edinburgh needed a long-term flooring solution for its shower room facilities after water from the existing setup was escaping past the old shower curtain and seeping onto the carpet outside. This was creating an unprofessional appearance while also raising concerns around damage, hygiene and day-to-day practicality in a hospitality setting.
Solution: Working with Downing Construction, ISG Resin Specialists carried out a full wet-room flooring upgrade designed specifically for this environment. The floor was prepared using diamond grinding, vacuuming and a primer coat, before an F1 mortar screed was laid to falls to direct water efficiently into the drain. A Flowfast quartz resin system with protective seal coats was then installed, along with a coved upstand around the perimeter, creating a seamless, slip-resistant and hygienic finish built for long-term performance.
Results: The completed installation transformed the shower room into a cleaner, smarter and more professional-looking space that also performs far better in daily use. Proper drainage now prevents water escaping onto surrounding carpeted areas, while the seamless resin finish improves hygiene, makes cleaning easier and provides a durable surface designed to stand up to the demands of a busy wet-room environment.

