We’ve got a new piece of kit on site. ISG Resin Specialists has invested in a new screed pump, allowing our team to carry out preparation works and install industrial screeds much faster and more efficiently across commercial and industrial spaces.
For our clients, that means quicker programmes, more consistent results and less time with floors out of action. Here’s what the new pump does, why it matters and how it fits into the way we prepare floors for resin.
Why we’ve invested in a screed pump
A large share of our commercial and industrial work starts long before any resin goes down. Many of the floors we’re asked to coat are uneven, damaged or covered in years of patch repairs, and they need levelling before a final finish can be installed properly.
Until now, much of that levelling has meant mixing material by hand, batch by batch. It works, but on larger floors it’s slow and physically demanding. The new screed pump mixes material continuously and delivers it straight onto the floor through a hose, so we can cover larger areas in a shorter working window.
It’s a practical upgrade, but it makes a real difference to how quickly we can get a site from bare slab to finished floor.


What the new pump means for your project
Faster installation
Pumping allows us to place screed far more quickly than hand mixing. On operational sites where every day of downtime costs money, that helps shorten the overall programme.
A more consistent finish
Every batch from the pump is mixed to the same consistency, and large areas can be poured continuously. That reduces the risk of visible joins or weaker spots where one batch meets another.
Less disruption on site
Fewer bags to move around, less mess and a more organised working area. That’s useful on live sites where we’re working around staff, deliveries and production.
What is industrial screeding?
An industrial screed is a levelling layer applied over an existing concrete floor to create a flat, sound base. It isn’t usually the final surface. Instead, it sits underneath a resin system or other floor finish and corrects the problems below: dips, damage, old repairs and level differences.
With the new pump, we can level floors using industrial screed systems from around 5mm to 30mm, depending on the condition of the floor and what the area needs. Thinner layers suit floors that are broadly sound but rough or slightly uneven, while deeper build-ups deal with more significant hollows or damage.
Does your floor need levelling?
A floor usually needs screeding before resin if you notice:
- Dips where water or cleaning fluids collect.
- Uneven patch repairs from old machinery bases or service trenches.
- Worn, broken-up concrete along forklift and pallet truck routes.
- Level changes between older and newer sections of slab.
- Damage left behind after old coatings have been removed.
Coating over these problems doesn’t hide them. A resin floor will follow every contour underneath, which can lead to poor drainage, uneven wear and a finish that doesn’t last as long as it should.
Where industrial screeding is used
Screeding is ideal for busy environments where the base needs to be prepared properly before coatings, resin or other flooring systems are installed. That includes:
- Factories and production areas
- Warehouses and distribution units
- Workshops and engineering facilities
- Food and drink production spaces
- Commercial units undergoing refurbishment
Once levelled, the floor is ready for whichever system suits the space, from heavy-duty factory flooring to hygienic flooring for food environments or anti-slip finishes for wet areas.
Preparation still comes first
A new pump speeds up the screeding stage, but it doesn’t replace good preparation. Before any screed goes down, the existing floor is mechanically prepared to remove contaminants and weak surface layers, repaired where needed and primed so the screed bonds properly.
That’s where many floor failures begin, so it’s a stage we never rush. You can read more about how we approach this on our floor preparation page.
Drying and curing times also matter. Resin systems are sensitive to moisture, so the screed must be ready before the final finish goes on. Timings depend on the product used, the thickness and site conditions, and we’ll always plan this into the programme from the start.
Frequently asked questions
Can screeding be carried out while a site is operational?
Often, yes. Work can be phased in sections or scheduled for evenings and weekends. The faster installation from pumping helps keep disruption to a minimum.
Do all floors need screeding before resin?
No. If a slab is sound and reasonably flat, preparation and repairs may be enough. Screeding is needed when the floor has dips, damage or level differences a coating can’t correct.
How do you decide how thick the screed should be?
We survey the floor first, checking levels, flatness and condition. The aim is to use the minimum build-up needed to achieve a flat, sound base for the final system.
Talk to us about your floor
If your floor is uneven, damaged or not ready for its final finish, we can help. Our team carries out industrial screeding and resin flooring on commercial and industrial sites across Glasgow, Lanarkshire and the rest of Scotland, and our new screed pump means we can now do it faster than ever.
Find out more about our floor screeding service or get in touch for a quote.